VDC for execution
Maimoni Engineering & Consultation provides contractors and entrepreneurs with a variety of VDC services for execution: BIM model management, execution, system coordination from a contractor’s perspective, 4D model for site operation, safety logistics and schedule management, 5D budget and accounts
Meet: VDC - innovation for the management of execution and construction sites with the help of BIM
VDC services for the execution phase are becoming more and more common thanks to the progress in the quality and reliability of the information in the BIM models of the design. VDC (Virtual Design Construction) is the use of information-based digital computing technologies (from the BIM models) for the purpose of optimizing the execution processes of projects.
AMEC provides quality VDC services outsourced to contractors and entrepreneurs who wish to leverage the technology and benefit from optimization and improved productivity immediately and reduce the risks and costs associated with developing knowledge in the organization independently.
AMEC’s VDC methods incorporate advanced technology developed and implemented in many projects in Israel.
The well-known joy of doing things of the company’s people brings with it a positive echo to every construction site, generates success and contributes to the personal development of the organic teams.
How do I promote VDC for execution in my project?
Today it is common for entrepreneurs to include a requirement for the continued management of the BIM model in the contract with the contractor. This requirement also helps ensure the continued development of the asset’s information model towards the asset’s operation and maintenance phase.
The contractor can hire VDC services for execution or through an organic team on the topic of BIM specifications for the contractor, you can get more information here.
Examples of VDC services in execution:
Organization area, cranes and equipment. Setting up a synchronization interface between an execution model and a planning model
Making the model accessible for all stakeholders on the site
Coordinating the execution of the final framework and systems, checking for conflicts and coordinating from an executive contractor point of view while consulting with the contractor’s execution elements.
Execution progress report in the BIM model and comparison to the planned schedule, acceleration plan
Implementing a schedule in a pre-model and creating a predictable future bill of accounts. Transparency and cooperation – reflecting the progress made in the BIM model for the developer
According to methods of measurement and digital accounts, accounts based on the model according to execution mode cutting
Digital maintenance – As made
A platform for project management and VDC
The BIM Search application is a BIM-based platform for construction management By connecting your models from the cloud
post on BIM Coordination 1
Welcome to WordPress. This is your first post. Edit or delete it, then start writing!